News and Events
वेबसार्इट http://gramshikshaparishadup.in पर ग्राम शिक्षा परिषद उत्तर प्रदेश, लखनऊ के अन्तर्गत 5131 प्रधानाचार्य, 10262 शिक्षक एवं 5131 चतुर्थ श्रेणी की सीधी भर्ती द्वारा अनुबंध के आधार पर भरने हेतु प्रकाशित विज्ञप्ति का उ0प्र0 सर्व शिक्षा अभियान एवं उ0प्र0 राज्य सरकार से कोर्इ भी सरोकार नहीं है।       Vigyapti for the vacant posts of SPO
About Us
Right to Information
Right to Education Act (RTE)
Educational Scenario
SSA Goals
SSA Guidelines
MHRD - Guidelines Dated 26/10/2012
Schemes/Activities
 
Role of Community
State Progress
District Wise Progress
Training Modules
Picture Gallery
News & Magzines/Tender/NGOs Participation
Other Useful Links
Email (for UPEFA employee only)
Data Capture Format (U-DISE 2016-17)
Procurement Plan 2017-18
Govt. Orders & Circulars of SPO
Plan & Budget
Release & Expenditure
Kasturba Gandhi Balika Vidyalaya
Organogram
Success Stories
Vacancies
DISE :5% Sample Checking Reports
 
News & Events
 
 
 


During the project period, in DPEP-III the construction of block resources centres, building for new and building less / reconstruction of primary schools, additional classrooms were taken. Existing schools were repaired, drinking water and toilet facilities were provided.

While in SSA the upper primary school buildings were also taken up.

The most significant aspect of civil work programme is involvement of this community and inclusion of innovation designs and child friendly elements in civil works.

The district was given freedom to choose one of the 5 designs on local conditions and requirement of this district-


Old Design Of Primary School

 

 

New Prototype Design - Bhorsil

Plinth Area : 122.00 Sq Mtr.
Cost : Rs. 1565.57/Sq Mtr.

Cost Effective Technologies

  • Red Trap Bond Wall.
  • Exposed outer Suface ( No plaster from out side)
  • Use of Locally available stone slab in roof.

                         Roshan Pura Design

                       

Plinth Area : 116.21 Sq Mtr.
Cost : Rs. 1643.57 /Sq Mtr.

Cost Effective Technologies

  • Red Trap Bond Wall.
  • Exposed outer Suface ( No plaster from out side)
  • Brick Carbol slab

Railway Ganj Design

Plinth Area : 103.55 Sq Mtr.
Cost : Rs. 1844.52 /Sq Mtr.

Cost Effective Technologies

  • Red Trap Bond Wall.
  • Exposed outer Suface ( No plaster from out side)
  • Brick Carbol Slab.

Asigaon Design

Plinth Area : 166.00 Sq Mtr.
Cost : Rs. 1646.55 /Sq Mtr.

Cost Effective Technologies

  • Red Trap Bond Wall.
  • Exposed outer Suface ( No plaster from out side)
  • RCC Filler Slab.

Bhamma Purva Design

Plinth Area : 102.00 Sq Mtr.
Cost : Rs. 1872.55 /Sq Mtr.

Cost Effective Technologies

  • Red Trap Bond Wall.
  • Exposed outer Suface ( No plaster from out side)
  • RCC Filler Slab.
  • Brick Carbol Slab.

Primary School

As per existing norms of Government of UP, there should be a primary school for habitation having a population 300 and within a walking distance of 1.5 km, while as per revised norms of Government of UP the primary school should be for habitation having population of 300 and within a waling distance of 1 km.

Upper Primary School

Habitation having a population of 800 and within a walking distance of 3 km. as per existing norm , while as per revised norms habitation having a population of 800 and within a walking distance of 2 km.

Unit Cost

The unit cost as fixed by GOUP -

  • Primary School
    1.91 lacs 40% of the unit cost is borne by project and the remaining 60% by through Rural development scheme of Pradhanmanri Gramadoyozna in DPEP programme. The revised unit cost for primary school is Rs. 2.44 lacs.
  • Upper Primary School
    The unit cost for upper primary school building is Rs. 4.95 lacs
  • Toilets :
    Rs. 0.13 lacs for a two roomed toilets (separati for girls and boys)
  • Drinking water
    Rs. 0.18 for deep bore India mark two handpump. The
    above pattern effected by G.O. No. 8278 / 15-5-98- 153 / 91 shiksha (5) Anubhag, Lucknow dated 23 Feb. 1998

Provision for Earthquake Resistance

In 2006-07 the earthquake resistance provisions has been made in Primary/ Upper Primary school buildings upto zone 4. On the basis of revised design the manual for Primary school, Upper Primary school and class room has been prepared and provided to the districts. the earthquake resistance designs have been vetted by National Seismic Advisor, Ministry of Home Affairs, Goverment of India, New Delhi.

The unit costs of Primary and Upper Primary school were revised. The revised cost of primary school building is Rs 2.64 lacs and upper primary school building is Rs 5.15 lacs.

The additional class room designs are also upgraded by adding earthquake resistance provision as well as the parameter of classroom or by revising the plan-as ground floor/ first floor.The revised unit cost of additional class room is 1.40 lacs. wide G.O no 794/79-5-2006-129/98 T.C Shiksha Anubhag-5 dated 24 April 2006.

Two day training of 2 engineers of RES department and 2 ABSA from each districts had been given in earthquake resistance provision in school building at UP Academy of Management and Training (IMDUP) Aliganj, Lucknow in month of  June 2006. these master trainers will trained the school teacher/ Rajmistree/ Pradhan the persons incharge for school building constructions.

 
 
School Chalo Abhiyan 2017
Ek Bhi Bachcha Play Music Pause Music
Ghar Ghar Play Music Pause Music
Ladka Ladki Play Music Pause Music
Shiksha Se Play Music Pause Music
Employee Login
UPEFA Web Monitoring Login
Email Login
 
Departmental Link
  Mid Day Meal
  Basic Education Department
  Basic Shiksha Parishad
  SCERT
  School Location Mapping (GIS)
 
Other Useful Link
 
 
 
Find us on Google Map
 
Click to view
 
Designed & developed by UPTRON Powertronics Ltd.. | Best Viewed in 1024 X 768 Resolution.